|
| About \ Stages Of Development \ | |||||||||
|
1965
AI-23U, AI-23SG In 1965 the plant mastered production of the AI-23U engine that was the modification of the AI-24 engine. It is used as a drive for 1700 hp Uralmash-3D-61 drilling rigs and Uralmash-5D-61 drilling rigs powered with two engines. In 1965 the plant mastered production of the AI-23U engine that was the modification of the AI-24 engine. It is used as a drive for 1700 hp Uralmash-3D-61 drilling rigs and Uralmash-5D-61 drilling rigs powered with two engines.
|
|
||||||||